First build entry [2.0 hours]

Still waiting for some tooling to arrive, and to finish various workshop items. I’ve been in no hurry to officially “start”, but for want of something else to do, today turned out to be the random date that I did the first work on actual parts of the aircraft. The place where everyone starts – cutting the VS-1014 flanges. So, I marked them out, used my awesome bandsaw to do the rough cuts, and took these down to dimension with a Vixen file. I also de-burred the flanges, as well as the VS-1003 rear spar that they fit into.

Filing the diagonal cuts on the VS-1014 flanges

Filing the diagonal cuts on the VS-1014 flanges

That’s it. Section 6 step 1 completed without incident.

Bookmark the permalink.

Comments are closed.